The Trials and Tribulations of a Novice Airplane Kit Builder
Vertical Stab
Date: 6-18-2006Number of Hours: 3.00 Manual Reference: 6 - VS Preparation Brief Description: VS Prep work Cleco'd all the ribs and necessary parts together for the vertical stab. Match drilled the stiffener to the rear spar. Same for the rib to spar holes. Put the skin on and clecoed in place. Next will be match drill the skin and then cut the lighening holes.
Date: 6-24-2006Number of Hours: 2.00 Manual Reference: 6 - VS Preparation Brief Description: VS Prep work continued No images. Deburred, dimpled, countersunk VS spar/ribs/skin etc. Primed all.
Date: 6-26-2006Number of Hours: 3.00 Manual Reference: 6 - VS Assembly Brief Description: VS Assembly Riveted vertical stabilizer rear spar, front spar and ribs. Started riveting the skin to the skeleton.
Date: 6-27-2006Number of Hours: 2.00 Manual Reference: 6 - VS Assembly Brief Description: VS Assembly Final Riveted all parts of the vertical stabilizer
TOTAL HOURS for VS: 10
Copyright 2007 All Rights Reserved.
Hobbs:Anything in this site is for entertainment purposes only and is not meant to be instructions in any way shape or form.