Vertical Stab

Date: 6-18-2006
Number of Hours: 3.00
Manual Reference: 6 - VS Preparation
Brief Description: VS Prep work

Cleco'd all the ribs and necessary parts together for the vertical stab. Match drilled the stiffener to the rear spar. Same for the rib to spar holes. Put the skin on and clecoed in place. Next will be match drill the skin and then cut the lighening holes.

Date: 6-24-2006
Number of Hours: 2.00
Manual Reference: 6 - VS Preparation
Brief Description: VS Prep work continued

No images. Deburred, dimpled, countersunk VS spar/ribs/skin etc. Primed all.

Date: 6-26-2006
Number of Hours: 3.00
Manual Reference: 6 - VS Assembly
Brief Description: VS Assembly

Riveted vertical stabilizer rear spar, front spar and ribs. Started riveting the skin to the skeleton.

Date: 6-27-2006
Number of Hours: 2.00
Manual Reference: 6 - VS Assembly
Brief Description: VS Assembly Final

Riveted all parts of the vertical stabilizer

TOTAL HOURS for VS: 10

 

 
 



 

Copyright 2007  All Rights Reserved.

Hobbs:
Hit Counter
Anything in this site is for entertainment purposes only
and is not meant to be instructions in any way shape or form.