The Trials and Tribulations of a Novice Airplane Kit Builder
8/1-31/2009 - 7 HoursLots of wiring stuff. Put connectors on everything that makes sense at this point. Put in a terminal block for the elevator trim near the emp attach area. Riveted tops skins. Fitted F704 channel covers as well. Panel Planning. 10" Dynon Skyview, 7" Dynon Skyview as backup (all flight instrument and GPS backup), Garmin SL30, GTX 327 or 330, Dynon Autopilot and HS34 (not pictured yet). Possibly switches will go into the blank area just to the left of the small Dynon. Not sure... need opinions from friends. Vent install: Fuel valve install
Copyright 2007 All Rights Reserved.
Hobbs:Anything in this site is for entertainment purposes only and is not meant to be instructions in any way shape or form.