5/11/08 - 10 Hours
Well for the past month and a half I really haven't got much accomplished. I last left off back in mid to late March on the ailerons. I was at the riveting stage. Over this past month and a half, I have finished up with the ailerons and started on the flaps.

Ailerons:

 

Flaps - I have the right one completely done. The left is prepped for riveting which will begin this week:


 

The reason for the slowdown is due to money. I don't have a lot of work left on the wings and I haven't ordered the fuselage yet. It will take 2.5 months for the fuse to get her leaving me plenty of time to finish the wings. I have taken this opportunity to finish yard work, pool landscaping and other things around the house. I will hopefully be ordering a fuse soon!

5/12-22/2008 - 5 Hours

Finished up the other flap.



5/23-27/2008 - 5 Hours

Right and Left Landing light kit installation. This is from the DuckWorks light kit. The directions are straight forward.

Here's the left:
 



Here's the right:

 
 
5/27/2008 - 1.5 Hours

Safe Air Pitot tube installation. Easy install per directions.